Capacity: 600,000TPA DRI H2-Based (Coal gas), not Midrex/HYL Add: Zhangjiakou, Hebei Tech: Green Iron, DRI, H2-based, HBI, with China Tech EPC Iron Ore: TFe≥65%, Fuel: coal gas, HV≥3000kcal/Nm3 EPC period: 24months Investment: 10billion CNY
Capacity: 600,000TPA DRI HIsmelt Jianlong Group Inner Mongolia Saisipu Add: Wuhai, Inner Mongolia Tech: HIsmelt, DRI, Smelting tech, No pellet/no coke Mine report—Market survey—EPS Iron Ore: TFe≥55%, SiO2≤7%, Al2O3≤5%, P≤0.175% Fuel: Pulverized coal Bituminous coal, HV≥6000kcal/kg EPC period: 18months Investment: 1.4billion CNY